Hi All - hoping someone can help please...
I'm fairly new to QAD, I am looking to upload the costing steps entry at once instead of building it manually in each screen (13.1 > 1.4.12>....) I have all the steps setup in CSV file just want to make sure which screen to upload to and if you have the uploading CSV file please share.
attached is what my manual entry looks like
Thanks

I'm fairly new to QAD, I am looking to upload the costing steps entry at once instead of building it manually in each screen (13.1 > 1.4.12>....) I have all the steps setup in CSV file just want to make sure which screen to upload to and if you have the uploading CSV file please share.
attached is what my manual entry looks like
Thanks
