Run 18.6 Schedule Explosion (rerpex.p).
OR
Run 23.1 Net Change Materials Plan(mrmpnc.p), 23.2 Regenerate Materials Plan(mrmpup.p), or 23.3 Selective Materials Plan(mrmprc.p).
Schedule was not exploded. Schedule likely modified after MRP was run and so there was unexploded schedule data.
wxu said:
18.14 Error msg: Unexploded schedules within consumption period. Please re-enter.