Forum Post: Date Input In Two Environments Results Different Behaviour

  • Thread starter Thread starter Aede Hoekstra
  • Start date Start date
Status
Not open for further replies.
A

Aede Hoekstra

Guest
We have two environments at our customer (test / production). These environments have the same configuration (as far as I can see). Same localization settings, and also the user has the same settings. Rollbase version 3.2.1, browser firefox. When we enter a date manually in a field the result after saving the record is different: test: input: 10-15-15 (dd-mm-yy) result 10-15-2015 production: input: 10-15-15 (dd-mm-yy) result 10-15-0015 Anyone an idea what is causing this?

Continue reading...
 
Status
Not open for further replies.
Back
Top