cumulative lead time

mfguser

New Member
Hi all,

The Cummulative Lead Time for Manufactured item is incorrectly calculated.

kindly advice as to what setups needs to be verified.

Thanks & Regards,
 
The Product Structure Code item must be set up in 1.4.1 Item Master Maintenance (ppptmt.p) in order for the cumulative lead time to roll up correctly in 13.12.14 Cumulative Lead Time Roll-up (bmpsru01.p)
 
Back
Top