Releasing a job for a new item under Standard Costing

Chris Kelleher

Administrator
Staff member
We are struggling over a procedural issue in Syteline 4.00.02.

All of our items are standard costed. Frequently, a new item master is
added and a job needs to be released to the floor immediately after the
current router is written. In SYMIX 3.0, either the person entering the
item, entered a standard cost on the item master when it was added or
accounting would catch it up on the Roll Current to Standard within a couple
of weeks. The job could be released whether it had a standard cost or not.

In Syteline, you can't release the job until the current router is rolled to
standard, and that requires "Mgr. - Inventory" permissions. I don't want to
give that permission to the people who write routers, or the people who
release jobs. It opens up way too much. How do others get around this
issue? Is there something I'm missing?


Lori Tamburlin
Pure Carbon Company
441 Hall Avenue
St. Marys, PA 15857
Voice: 814 781 1573 (x9314)
Fax: 814 781 9211
 
Bon Matin Lori,

We are on Symix 4.0 and the Item Creation Process requires the controller to
run Roll-Up for new/copied items. I must add that being in a repetive
manufacturing environment products are not created every day (only every
other day :-) ...

Eric.
 