I was wondering if anyone had successfully used this in production where they had a senario similar to the following:

We plan for and make say 10 meters of a product and from that we expect to get 10 1 meter products. QA fails a product and we produce 3 of a smaller length from that failed product.

Output is 9 x 1 meter and 3 x 30 cm = 12 items instead of the planned. We cant backflush the order to get more packaging because mfgpro thinks that we then will need more base material.

Solution = Assign a BOM to each item but I dont think we can do that.......


Anyone???

Really appreciate your thoughts here. I'm very new to this and this particular problem has an urgency all of its own :D

Regards
 
Hi,

Thanks for that but I've already had a look through the manual and in theory at least it is possible but in practice its not so straightforward.