Search results

  1. K

    Labor Cost not calculated correctly on backlfushed operation

    Can anyone help, or have they run into this before? We are on SyteSuite 4.5, SyteLine 4.01.01 The system does not calculate the amount of labor time correctly on backflushed jobs. To replicate: Our system is set to standard cost An item has a unit of measure of eaches, an order minimum of...
Back
Top