anandpatwari31
Member
I am having an issue/question with Missed shipment event generator.
I have correctly setup the Category,events, supplier registrations in Pro/plus.
Now i have created a PO for that supplier.
PO line performance date was kept as 02/25/10 (mm/dd/yy) . Now when i am running the 5.15.17 with as of date = 02/25/10 (running it today) then i am not getting the Missed event .
Acceptable days late is 1 in supplier registration. so this PO is not at all in acceptable range.
I have correctly setup the Category,events, supplier registrations in Pro/plus.
Now i have created a PO for that supplier.
PO line performance date was kept as 02/25/10 (mm/dd/yy) . Now when i am running the 5.15.17 with as of date = 02/25/10 (running it today) then i am not getting the Missed event .
Acceptable days late is 1 in supplier registration. so this PO is not at all in acceptable range.