gerie
Member
I have a progress database10.1C from about 95 gb.
The data was located on an EVA storrage.
Since 2 months the storage is changed from Eva to 3PAR.
I was told this system would have a better performance.
My online back-up's had a running time from about 1,5 hours and then it was finished.
But after the change from EVA to 3PAR the running time from an online back-up is between 3,5 and 7 hours.
Imo this is not acceptable. My system administrator keeps telling me that I just can't work with full back-ups anymore, but I have to use transactionlogging now.
I'm wondering what your thoughts are about this issue.
The data was located on an EVA storrage.
Since 2 months the storage is changed from Eva to 3PAR.
I was told this system would have a better performance.
My online back-up's had a running time from about 1,5 hours and then it was finished.
But after the change from EVA to 3PAR the running time from an online back-up is between 3,5 and 7 hours.
Imo this is not acceptable. My system administrator keeps telling me that I just can't work with full back-ups anymore, but I have to use transactionlogging now.
I'm wondering what your thoughts are about this issue.